White House Timetable Slips for Solar Roof
Amid a surge of solar energy industry moves aimed at making installations faster, easier, and more affordable, one of the highest-profile rooftop projects is taking longer than hoped.
The Obama administration missed its planned spring 2011 date for putting solar photovoltaic (PV) panels and a heating system atop the White House—an effort meant to boost the profile of the renewable energy technology by bringing it back to the U.S. presidential residence for the first time in 25 years. (See last fall’s announcement at the Green Gov symposium hosted by our Planet Forward partners here.)
The U.S. Department of Energy (DOE), which is managing the project, attributed the delay to the ordinary deliberate pace of the federal government procurement process. And as